Operation mobile training center is nearing completion!!!

Yup, it’s getting very near completion and well soon be able to offer mobile training at a cost that is affordable.


Looking into the kitchen area where the microwave and frig will go. Countertop on right will have a sink and area for prep. Pantry on the left to store food items. Around the little wall on the right will be the toilet.


Pantry with plenty of storage.


Sink will go on the right with plumbing, 12v pump and water storage tank. Food prep on left with a wire shelf rack for dishes underneath (not shown).


Living area will have futon on right and tv and storage on left with additional counter space.


All in all it’s coming along nicely. Still have paint and trim to do. Appliances and futon are coming soon.

27 views3 comments

Recent Posts

See All

1 My brethren, do not hold the faith of our Lord Jesus Christ, [the Lord] of glory, with partiality. 2 For if there should come into your assembly a man with gold rings, in fine apparel, and there sho

My notes are in the brackets in italics “But their [the unbelieving jews of old] minds were hardened. For to this day, when they [the unbelieving jews] read the old covenant, that same veil remains un

1 James, a bondservant of God and of the Lord Jesus Christ, To the twelve tribes which are scattered abroad: Greetings. The author of this epistle is known as James the Great, not James the brother of